• de
  • en
  • fr
  • International Database and Gallery of Structures

Colo River Bridge

General Information

Completion: 1990s
Status: in use

Project Type

Structure: Double T-section girder bridge
Function / usage: Road bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: ,

Technical Information

Dimensions

span lengths 22 m - 5 x 28 m - 22 m

Materials

superstructure prestressed concrete

Participants

Main contractor
Prestressing

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004120
  • Date created
    04/07/2002
  • Last Update
    05/02/2016