0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1957
Completion: March 1964
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , ,
Crosses:
  • Clyde River
Coordinates: 55° 52' 18.76" N    4° 19' 47.56" W
Coordinates: 55° 51' 54.32" N    4° 19' 53.05" W
Show coordinates on a map

Technical Information

Dimensions

length 762 m

Cost

cost of construction Pound sterling 10 500 000

Participants

Structural engineering
Main contractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20009192
  • Published on:
    26/04/2003
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine