Advertisement

Share

Follow

Donate

Chiswick Bridge

General Information

Beginning of works: 1930
Completion: 3 July 1933
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
, , , ,
Crosses:
  • Thames River
Coordinates: 51° 28' 23.16" N    0° 16' 11.00" W
Show coordinates on a map

Technical Information

Dimensions

total length 185 m
span lengths 18.59 m - 38.1 m - 45.72 m - 38.1 m - 18.59 m
deck deck width 21.34 m

Cost

cost of construction Pound sterling 208 284

Materials

arches reinforced concrete
veneer stone

Chronology

September 1930

Beginning of works.

3 July 1933

The bridge is openend by the Prince of Wales.

Advertisement

Participants

Design
Architectural consulting
Contractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011235
  • Date created
    01/01/2004
  • Last Update
    02/02/2018