• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Cheongdam Grand Bridge

General Information

Name in local language: 청담대교 / 淸潭大橋 (Cheongdam daegyo / Ch‘ŏngdam taekyo)
Beginning of works: December 1993
Completion: 23 December 1999
Status: in use

Project Type

Structure: Rigid frame bridge
Function / usage: Railroad (railway) bridge
Road bridge
Material: Steel bridge

Location

Location: ,
Crosses:
  • Han River
Coordinates: 37° 31' 34.06" N    127° 3' 51.34" E

Technical Information

Dimensions

main span 90 m
total length 1 211 m
deck deck width 27 m

Materials

deck steel
piers reinforced concrete
portal legs steel

Participants

Relevant Web Sites

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20006578
  • Date created
    06/11/2002
  • Last Update
    07/01/2017