• de
  • en
  • fr
  • International Database and Gallery of Structures

Carrières Viaduct

General Information

Beginning of works: 1995
Completion: 1996
Status: in use

Project Type

Structure: Haunched girder bridge
main bridge:
Box girder bridge
approach viaducts:
T-section girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: main bridge:
Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: , , ,
, , ,
Crosses:
  • Seine River
Carries:
  • Autoroute A14
Part of:
Coordinates: 48° 54' 24.00" N    2° 11' 35.00" E

Technical Information

Dimensions

approach viaducts total length 155 m
span lengths 5 x 30.5 m
deck deck width 2 x 12.5 m
main bridge deck depth 3 - 8 m
total length 510 m
span lengths 72 m - 3 x 122 m - 72 m

Materials

deck prestressed concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004119
  • Date created
    03/07/2002
  • Last Update
    05/02/2016