• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Camille de Hogues Bridge

General Information

Beginning of works: 1899
Completion: September 1900
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
Crosses:
  • Vienne River
Coordinates: 46° 48' 49.42" N    0° 32' 14.86" E

Technical Information

Dimensions

main span 50 m
length of side spans 2 x 40 m
total length 144 m
number of spans 3
arches rise 4.0 m / 4.8 m / 4.0 m
deck deck width 8.0 m

Materials

deck reinforced concrete
arches reinforced concrete

Chronology

August 1899

Foundation works begin.

29 March 1900
- 5 April 1900

Load testing

5 November 1900

Main structural works are completed.

15 December 1900

Falsework is removed.

Participants

Design
Construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000489
  • Date created
    13/11/1999
  • Last Update
    05/02/2016