General Information

Beginning of works: 1996
Completion: 1998
Status: in use

Project Type

Location

Location: , , ,
Address: Büttnerstraße
Crosses:
  • Mittellandkanal
Part of:
Replaces: Büttnerstrasse Bridge (1913)
Coordinates: 52° 24' 39.14" N    9° 43' 47.58" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 13.81 m - 69.02 m - 13.81 m
total width 11.60 m

Cost

cost of construction German Mark 6 200 000

Materials

deck composite steel-reinforced concrete
arch steel

Advertisement

Participants

Structural engineering
Checking engineering
  • Peil (checking engineer)
Main contractor
Contractor

Relevant Web Sites