0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1913
Status: demolished (1998)

Project Type

Structure: Three-hinged arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
Address: Großer Kolonnenweg
Crossed:
  • Mittellandkanal
Part of:
Next to: Grosser Kolonnenweg Bridge (1961)
Replaced by: Grosser Kolonnenweg Road Bridge (1998)
Coordinates: 52° 24' 27.98" N    9° 44' 22.11" E
Show coordinates on a map

Technical Information

Dimensions

arch span 47.00 m
total width 16.00 m

Materials

arch reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008697
  • Published on:
    21/03/2003
  • Last updated on:
    16/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine