• de
  • en
  • fr
  • International Database and Gallery of Structures

Beneckeallee Bridge

General Information

Beginning of works: 1994
Completion: 1995
Status: in use

Project Type

Structure: Nielsen-Lohse bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Address: Beneckeallee (K 13)
Crosses:
  • Mittellandkanal
Part of:
Replaces: Beneckeallee Bridge (1913)
Coordinates: 52° 25' 8.97" N    9° 42' 23.65" E

Technical Information

Dimensions

arch span 63.83 m
total width 21.50 m

Cost

cost of construction German Mark 6 900 000

Materials

deck composite steel-reinforced concrete
arch steel

Chronology

June 1994

Construction begins.

August 1995

Opened to traffic.

December 1995

Completion.

Participants

Client
Architecture
Structural engineering
Checking engineering
Construction
Main contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008692
  • Date created
    21/03/2003
  • Last Update
    05/02/2016