• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Cantilever construction using temporary stays in vertical position, then rotation into horizontal

Cantilever construction of the arch using temporary stays in a quasi vertical position. When both halves are completed, they are rotated around a hinge at the springings to close the arch at the final horizontal position.

Structures in this category

  • entry with pictures
  • new entry (30 days)
  • updated entry (14 days)
# Name Country
1 Argentobel Bridge Germany
2 Hundwilertobelbrücke Switzerland
3 Wildbrücke Völkermarkt Austria

Literature

Find a Structure or Project ...
Premium Partnerships

Recently Added RSS

Switzerland (1992) , added on 19/04/2003

Germany (1986) , added on 14/02/2003

Recently Illustrated RSS

Germany (1986)
1 new image added on 16/06/2009

Switzerland (1992)
3 new images added on 25/04/2006