Bordeaux Transporter Bridge

General Information

Name in local language: Pont transbordeur de Bordeaux
Beginning of works: 19 September 1910
Status: demolished (18 August 1942)

Project Type

Structure: Suspension bridge
Function / usage: Transporter bridge
Material: Steel bridge

Location

Location: , , ,

Technical Information

Dimensions

total length 400 m
height above valley floor or water 45 m
pylon pylon height 95 m

Materials

pylons steel

Chronology

1891

Studies are undertaken for the construction of a new bridge.

1909

The transporter bridge type is chosen.

19 September 1910

First stone is laid by President Armand Fallières.

1914

Construction is interrupted by the war as the pylons are completed. The works are never finished.

18 August 1942

The pylons are dynamited.

Participants

Design
Construction

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004468
  • Date created
    14/08/2002
  • Last Update
    05/07/2017