Advertisement

Share

Follow

Donate

Bogenbrücke über den Britzer Verbindungskanal

General Information

Beginning of works: 2001
Completion: 2002
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Motorway bridge / freeway bridge
Material: Steel bridge

Location

Location: , , ,
, , ,
Crosses:
  • Britzer Verbindungskanal
Carries:
  • Autobahn A113 (new)
Part of:
Coordinates: 52° 27' 33.49" N    13° 27' 27.58" E
Show coordinates on a map

Technical Information

Dimensions

arch span 112.10 m
bridge surface 3 894 m²
total width 34.74 m
roadway / carriageway width 2 × 14.90 m

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction Euro 16 800 000

Materials

arches steel
deck slab reinforced concrete

Advertisement

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001352
  • Date created
    11/03/2001
  • Last Update
    05/02/2016