• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Blombachtalbrücke

General Information

Beginning of works: 1957
Completion: 1959
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Construction method: In-situ casting on falsework
Material: Reinforced concrete bridge

Location

Location: , ,
Address: Parkstraße (L 419)
Crosses:
  • Autobahn A1
Part of:
Coordinates: 51° 14' 21.85" N    7° 13' 50.20" E

Technical Information

Dimensions

width 14.7 m
height 50 m
total length 296 m
span lengths 15.5 m - 3 × 16.0 m - 150 m - 16.0 m - 19.0 m - 2 × 16.0 m - 15.5 m
arch width 11.3 m
rise 27.0 m
arch span 150 m

Materials

deck reinforced concrete
piers reinforced concrete
arch reinforced concrete
piers on arch reinforced concrete

Notes

Last great arch bridge in Germany built on falsework.

Participants

Design
Structural engineering
Architectural consulting
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005501
  • Date created
    25/09/2002
  • Last Update
    21/10/2016