Advertisement

Share

Follow

Bleichinselbrücke

General Information

Beginning of works: 2014
Completion: 1 November 2015
Duration of works: 15 months
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Neckar River
Coordinates: 49° 8' 50.15" N    9° 12' 42.17" E
Show coordinates on a map

Technical Information

Dimensions

width 24 m
total length 87.600 m
number of spans 5
roadway / carriageway width 14.00 m
walkway width 2 × 3.95 m
deck span lengths 17.019 m - 17.843 m - 17.958 m - 17.711 m - 17.068 m

Quantities

structural steel 430 t
concrete volume 1 800 m³

Cost

cost of construction Euro 8 500 000

Materials

foundations reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders steel
portal legs steel

Advertisement

Participants

Owner
Design
Structural engineering
Checking engineering
Contractor
Steel construction
Material supplier

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20071214
  • Date created
    18/05/2016
  • Last Update
    13/03/2018