• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Blautalbrücke

General Information

Beginning of works: 2000
Completion: 2002
Status: in use

Project Type

Location

Location: , ,
Coordinates: 48° 24' 11.00" N    9° 56' 50.00" E
Show coordinates on a map

Technical Information

Dimensions

total length ca. 685.00 m
bridge surface 13 000 m²
standard span lengths 29.00 - 31.00 m
deck deck depth 1.10 m
pylon pylon height ca. 20 m

Cost

cost of construction ca. Euro 15 000 000

Materials

cables steel wire
deck prestressed concrete
pylons prestressed concrete

Products, Services & Reports

Because the DYNA Bond® anchorage can be filled either with cement or epoxy grout, it has excellent fatigue resistance and is protected against exte ...

[more]

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005323
  • Date created
    22/09/2002
  • Last Update
    21/04/2016
<