• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Bhairab Bridge

General Information

Beginning of works: 2000
Completion: 2002
Status: in use

Project Type

Location

Location: ,
,
Crosses:
  • Meghna River
Coordinates: 24° 2' 39.65" N    90° 59' 45.89" E

Technical Information

Dimensions

main span 110 m
deck deck depth 5.8 - 2.7 m
main bridge
length ca. 1 km

Quantities

concrete volume 61 000 m³
prestressing steel 690 t
reinforcing steel 8 500 t

Cost

cost of construction Bangladeshi taka 2 193 930 035

Materials

superstructure prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004369
  • Date created
    26/07/2002
  • Last Update
    05/02/2016