Advertisement

Share

Follow

Bettelmannsholz Bridge

General Information

Official designation: BW 5312/02
Beginning of works: 1997
Completion: 1998
Duration of works: 12 months
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , , ,
, , , ,
Address: K 27
Crosses:
  • Autobahn A71
Part of:
Near: Behringen Tunnel (Motorway)
Behringen Tunnel (Rail) (1998)
Coordinates: 50° 47' 27.06" N    11° 0' 10.05" E
Show coordinates on a map

Technical Information

Dimensions

length 102 m
bridge surface 1 020 m²
arches rise max. 13.50 m
span lengths 28.0 m + 44.0 m
deck deck depth 0.88 m
span lengths 8.0 m - 2 × 14.0 m -12.0 m - 10.0 m -3 × 8.0 m - 2 × 10.0 m
deck width 10.0 m

Cost

cost of construction German Mark 2 650 000
cost of construction per m² German Mark 2 600

Materials

arches reinforced concrete

Advertisement

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20020181
  • Date created
    21/03/2006
  • Last Update
    15/03/2018