Advertisement

Share

Follow

Bellmouth Bridges

General Information

Completion: 2001
Status: in use

Project Type

Structure: Bascule bridge
Function / usage: Road bridge

Location

Location: , , ,
Part of:
Coordinates: 51° 30' 15.00" N    0° 0' 55.00" W
Coordinates: 51° 30' 17.00" N    0° 0' 54.00" W
Show coordinates on a map

Technical Information

Dimensions

span 23 m

Cost

cost of construction Pound sterling 3 500 000

Materials

bascule span steel

Advertisement

Participants

Owner
Architecture
Structural engineering
Subcontractor

Relevant Web Sites

Relevant Publications

  • Cutlack, John (2008): Conceptual Design of Moving Footbridges. Presented at: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal, pp. 135-136.
  • About this
    data sheet
  • Structure-ID
    20003477
  • Date created
    03/06/2002
  • Last Update
    05/02/2016