Advertisement

Share

Follow

Bellinzona-Lugano Rail Viaduct

General Information

Beginning of works: 2011
Completion: 11 December 2014
Status: in use

Project Type

Location

Location: , ,
See also: Lugano-Bellinzona Rail Viaduct (2015)
Coordinates: 46° 9' 30.62" N    8° 59' 9.06" E
Show coordinates on a map

Technical Information

Dimensions

total length 442 m

Materials

deck prestressed concrete

Products, Services & Reports

mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structur ...

[more]

The mageba Shock Transmission Unit (STU) is designed to be connected between bridge structure components to form a rigid link under dynamic loads i ...

[more]

Advertisement

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070505
  • Date created
    20/01/2016
  • Last Update
    08/04/2019