Beles Hydroelectric Power Plant

General Information

Beginning of works: 2 June 2007
Completion: 11 May 2010
Status: in use

Project Type

Structure: power plant:
Cavern
Function / usage: Hydroelectric dam / plant
Construction method: tunnels:
Tunnel boring machine (TBM)

Location

Location: ,
Coordinates: 11° 49' 10.00" N    36° 55' 8.00" E

Technical Information

Dimensions

headrace tunnel length 11 822 m
excavation diameter 8.100 m
tailrace tunnel length 7 202 m
excavation diameter 8.070 m

Participants

Structural engineering
TBM manufacturer
Hydraulic consultant

Relevant Web Sites