Advertisement

Share

Follow

Ba River Bridge

General Information

Beginning of works: 1995
Completion: 1997
Status: in use

Project Type

Function / usage: Road bridge
Construction method: Precast girders with cast-in-situ slab
Material: Prestressed concrete bridge

Location

Location:
Coordinates: 17° 32' 0.25" S    177° 40' 59.03" E
Show coordinates on a map

Technical Information

Dimensions

width 11 m
total length ca. 200 m

Materials

deck slab reinforced concrete
girders precast prestressed concrete

Advertisement

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20019945
  • Date created
    11/03/2006
  • Last Update
    05/02/2016