• de
  • en
  • fr
  • International Database and Gallery of Structures

AVE Line Córdoba-Málaga

General Information

Beginning of works: 25 July 2001
Completion: 23 December 2007
Status: in use

Project Type

Function / usage: High-speed rail line

Location

km Name

Technical Information

Dimensions

total length 170.2 km
number of bridges 23 (5.9 km)
number of tunnels 7 (19.4 km)
length of newly built track 155.9 km

Design Loads

design speed 250 - 300 km/h

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    10000089
  • Date created
    15/05/2002
  • Last Update
    16/05/2015