• de
  • en
  • fr
  • International Database and Gallery of Structures

Altstadtkreisel

General Information

Beginning of works: 2004
Completion: 2006
Status: in use

Project Type

Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
Address: B 244 / L 86
See also: Altstadtkreisel Footbridge (2006)

Technical Information

Dimensions

total length 546 m
roadway / carriageway width 11.75 m
trough length 317 m

Cost

cost of construction Euro 14 670 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20022131
  • Date created
    06/07/2006
  • Last Update
    29/07/2014