• de
  • en
  • fr
  • International Database and Gallery of Structures

Alt Vinnhorst Bridge

General Information

Beginning of works: September 1995
Completion: January 1998
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Address: Alt Vinnhorst
Crosses:
  • Mittellandkanal
Part of:
Replaces: Alt Vinnhorst Bridge (1913)
Coordinates: 52° 25' 17.78" N    9° 41' 59.47" E

Technical Information

Dimensions

arch span 64.35 m
total width 17.00 m

Quantities

structural steel 309 t

Cost

cost of construction German Mark 7 000 000

Materials

deck composite steel-reinforced concrete
arch steel
abutments reinforced concrete

Chronology

September 1995

Construction begins.

July 1997

Opened to traffic.

January 1998

Completion.

Participants

Architecture
Structural engineering
Checking engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008690
  • Date created
    21/03/2003
  • Last Update
    16/07/2017