• de
  • en
  • fr
  • International Database and Gallery of Structures

Agas-Agas Bridge

General Information

Beginning of works: 17 November 2006
Completion: 2 August 2009
Status: in use

Project Type

Structure: Haunched girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: , ,
Coordinates: 10° 29' 46.39" N    124° 59' 52.68" E

Technical Information

Dimensions

main span 177 m
total length 350 m
height above valley floor or water 89 m
pier 1 height 73 m
pier 2 height 75 m

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20052902
  • Date created
    11/02/2010
  • Last Update
    12/01/2017