Advertisement

Share

Follow

Donate

A 30 Werre East Bridge

General Information

Official designation: BW 29
Beginning of works: 2009
Completion: 2012
Status: completed

Project Type

Location

Location: , , ,
Crosses:
  • Werre River
Part of:
Carries: A 30 Motorway (Germany)
See also: A 30 Werre West Bridge (2012)
Coordinates: 52° 13' 9.00" N    8° 49' 28.00" E
Show coordinates on a map

Technical Information

Dimensions

total length 152.85 m
span lengths 42.60 m - 67.95 m - 42.30 m
deck width 31.8 m
bridge surface 5 023 m²
cables diameter 140 mm
154 mm
length 25 m
number 16 (ø 140 mm)
8 (ø 154 mm)

Quantities

substructure concrete volume 3 489 m³
reinforcing steel 382 t
superstructure structural steel 2 416 t
concrete volume 2 329 m³
reinforcing steel 618 t

Design Loads

design code(s) DIN FB 101; ARS 10/2003

Cost

cost of construction ca. Euro 18 500 000

Advertisement

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20051109
  • Date created
    01/01/2010
  • Last Update
    22/06/2016