General Information

Beginning of works: 2006
Completion: December 2008
Duration of works: 32 months
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: ,
,
Part of:
Coordinates: 20° 54' 6.57" S    55° 30' 19.43" E
Show coordinates on a map

Technical Information

Quantities

concrete volume 28 025 m³
prestressing steel 261.5 t
reinforcing steel 2 165 t
volume of earthworks 180 000 m³

Cost

construction cost (without tax) Euro 35 800 000

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20024944
  • Published on:
    09/11/2006
  • Last updated on:
    05/04/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine