0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The climbing units, consisting of wall formwork and platforms, were moved from storey to storey using an integrated hydraulic system.

The climbing units, consisting of wall formwork and platforms, were moved from storey to storey using an integrated hydraulic system.

Media-ID: 276296
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 27/04/2017

More media of this structure

United Arab Emirates (2018)

More media for this product/service available at: