Image No. 292337

40 m of carriageway bridging: overnight, the 21 m long, pre-assembled truss girder units were lifted and coupled to shoring towers using a mobile crane. At 6 o'clock, the bridge could be re-opened for traffic.
Image-ID: 292337
Description:

40 m of carriageway bridging: overnight, the 21 m long, pre-assembled truss girder units were lifted and coupled to shoring towers using a mobile crane. At 6 o'clock, the bridge could be re-opened for traffic.

Image provded by: PERI, image used with kind permission.