For realizing the Moselle Lock in Trier, around 45,000 m³ of concrete was processed during the construction period of almost 1.5 years.
Image-ID: 292250
Description:

For realizing the Moselle Lock in Trier, around 45,000 m³ of concrete was processed during the construction period of almost 1.5 years.

Image provded by: PERI, image used with kind permission.