Advertisement

Share

Follow

Image No. 243252

The 74 meter long, 700 tonne tunnel boring machine "Bärlinde" drilled under the Spree River, on to the Humboldtforum and Spree Canal, below Unter den Linden and onwards to the U-Bahn station at the Brandenburg Gate
Image-ID: 243252
Description:

The 74 meter long, 700 tonne tunnel boring machine "Bärlinde" drilled under the Spree River, on to the Humboldtforum and Spree Canal, below Unter den Linden and onwards to the U-Bahn station at the Brandenburg Gate

Author/Source:

Antonio Reetz-Graudenz

Image provded by: Implenia Construction SA, image used with kind permission.
Copyright notice / License:

This picture is copyrighted material and may not be used without explicit approval by the photographer and/or copyright owner.

Date created
Last Update 09/07/2017

Advertisement

More images of this structure are available at:

More images for this product/service available at: