• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Image No. 242220

Thanks to the detailed planning provided by PERI engineers and high flexibility of the PERI balanced cantilever equipment, the superstructure of the cable stay bridge could be completed according to the schedule.
Image-ID: 242220
Description:

Thanks to the detailed planning provided by PERI engineers and high flexibility of the PERI balanced cantilever equipment, the superstructure of the cable stay bridge could be completed according to the schedule.

Copyright held by: PERI GmbH, image used with kind permission.
Copyright notice / License:

This picture is copyrighted material and may not be used without explicit approval by the photographer and/or copyright owner.

Date created
Last Update 09/07/2017

More images of this structure are available at:

More images for this product/service available at:

Other images of similar structure types are available at: