Advertisement

Share

Follow

Donate

Jiří Stráský

The following bibliography contains all the publications known to and listed in Structurae. The list may not provide a complete bibliography for this person.

  1. Stráský, Jiří (2016): Search for the true structural solution. Presented at: 26. Dresdener Brückenbausysmposium, 14./15. März 2016, Dresden (Germany), pp. 47-66.
  2. Nečas, Radim / Stráský, Jiří (2017): Footbridges with Prestressed Concrete Decks. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin), pp. 44-53.

    https://doi.org/10.24904/footbridge2017.01040

  3. Stráský, Jiří (2005): Pedestrian bridges utilizing high-strength contrete. Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005.
  4. Stráský, Jiří (2008): Stress-Ribbon Pedestrian Bridges Supported or Suspended on Arches. Presented at: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal, pp. 219-220.
  5. Sanchez, Anthony / Stráský, Jiří / Tognoli, Joe (2008): The Lake Hodges Stress Ribbon Bridge, San Diego, California. Presented at: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal, pp. 221-222.
  6. Kolácek, Jan / Nečas, Radim / Stráský, Jiří (2011): Curved Cable Stayed and Suspension Pedestrian Bridges. Presented at: 4th International Conference Footbridge 2011, 6-8 July 2011, Wroclaw, Poland.
  7. Hrnčířová, Michala / Nečas, Radim / Stráský, Jiří (2011): Flat Arch Stiffened by a Suspension Cable. Presented at: 4th International Conference Footbridge 2011, 6-8 July 2011, Wroclaw, Poland.
  8. Jurík, Michal / Kocourek, Petr / Nečas, Radim / Stráský, Jiří (2011): Curved Stress Ribbon and Flat Arch Pedestrian Bridges. Presented at: 4th International Conference Footbridge 2011, 6-8 July 2011, Wroclaw, Poland.
  9. Mojzik, Petr / Nečas, Radim / Puda, Vladimir / Stráský, Jiří (2011): Bicyclist and Pedestrian Bridge Across the Motorway D1, Bohumin, Czech Republic. Presented at: 4th International Conference Footbridge 2011, 6-8 July 2011, Wroclaw, Poland.
  10. Stráský, Jiří (2013): Bridge Engineering in the Czech Republic. In: Chen, Wai-Fah (2013): Handbook of International Bridge Engineering. CRC Press, Boca Raton (USA), ISBN 978-1439810293, pp. 341-365.
  11. Formanek, Martin / Kocourek, Petr / Nečas, Radim / Stráský, Jiří (2014): Integral arch footbridges. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014.
  12. Hochman, Dominik / Nečas, Radim / Stráský, Jiří / Trenz, Jan (2014): Space arch pedestrian bridges. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014.
  13. Kolácek, Jan / Nečas, Radim / Stráský, Jiří (2012): Dynamic response of concrete footbridges. In: Structural Concrete, v. 13, n. 2 (June 2012), pp. 109-118.

    https://doi.org/10.1002/suco.201200001

  14. Stráský, Jiří (2001): Betonové mosty TK 21. IC ČKAIT, s.r.o., Prague (Czechia), pp. 103.
  15. Nečas, Radim / Štefan, Petr / Stráský, Jiří (2011): Footbridge across the River Svratka in Brno, Czech Republic. In: Structural Concrete, v. 12, n. 2 (June 2011), pp. 76-81.

    https://doi.org/10.1002/suco.201100005

  16. Stráský, Jiří (2011): Structures and impact factor. In: Structural Concrete, v. 12, n. 3 (September 2011), pp. 137.

    https://doi.org/10.1002/suco.201190015

  17. Stráský, Jiří (2003): The power of prestressing. In: Structural Concrete, v. 4, n. 1 (March 2003).
  18. Cobo del Arco, Diego / Novotny, Petr / Raventós Dudous, Ingrid / Stráský, Jiří: Lo passador. Un nuevo puente sobre el Ebro en el Delta. Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008.
  19. Sánchez, Tony / Stráský, Jiří / Tognoli, Joe (2008): Triple jump. In: Bridge Design & Engineering, v. 14, n. 53 (4th Quarter 2008), pp. 26-28.
  20. Husty, I. / Kolcava, S. / Stráský, J. (1990): Die Spannbeton-Schrägseilbrücke über die Elbe bei Podebrady, Tschechoslowakei. In: Beton- und Stahlbetonbau, v. 85, n. 1 (January 1990), pp. 18-22, 45-51.
  21. Franc, J. / Stráský, J. / Zák, J. (1990): Die Stahlpylone der Schrägseilbrücke über die Elbe bei Podebrady. In: Stahlbau, v. 59, n. 4 (April 1990), pp. 105-111.
  22. Stráský, J. (1987): Spannband-Fussgängerbrücken aus Fertigteilen in der Tschechoslowakei. In: Beton- und Stahlbetonbau, v. 82, n. 9 (September 1987), pp. 246-252.

    https://doi.org/10.1002/best.198700400

  23. Stráský, Jiří (2005): Stress ribbon and cable-supported pedestrian bridges. Thomas Telford Publishing, London (United Kingdom), pp. 240.
  24. Husty, Ilja / Juttner, Vilem / Stráský, Jiří: Composite bridges built in the area influenced by a mining subsidance. Presented at: Steelbridge 2004, Millau, 23-25 June 2004, pp. 65-66.
  25. Juttner, Vilem / Stráský, Jiří: Composite Bridges built in the Area influenced by a Mining Subsidence. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 254-255.
  26. Stráský, Jiří: Concrete tension structures. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon.
  27. Stráský, Jiří (2003): Le passerelle a nastro teso e i ponti pedonali sospesi / Stress Ribbon and Suspension Pedestrian Bridges. In: Rassegna - Edizione Bilingue, n. 79 ( 2003), pp. 103-109.
  28. Stráský, Jiří (2002): New structural concept for footbridges. Presented at: Footbridge 2002, Paris, 20-22.11.2002.
  29. Stráský, Jiří / Studnickova, Marie: Pedestrian bridge across the Swiss bay of Vranov Lake (Czech Republic). Presented at: Ponts suspendus et à haubans. Cable-stayed and suspension bridges, Deauville, 12.-15.10.1994, pp. 163.
  30. Hsie, Jeder / Stráský, Jiří / Tseng, Wen S.: Cable-stayed bridge for high speed rail in Taiwan. Presented at: Ponts suspendus et à haubans. Cable-stayed and suspension bridges, Deauville, 12.-15.10.1994, pp. 453.
<