• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

David Goodyear

Biographical Information

Name: David Goodyear
Place(s) of activity:
1973

Bachelor's degree in Structural Engineering, Cornell University.

1974

Master's degree in Structural Engineering, Cornell University.

1988 - 1995

Founder and President of DGES (David Goodyear Engineering Services) Consulting Engineers, Inc. in Olympia, Washington.

Since 1995

Senior Vice President of T.Y. Lin International.

Structures and Projects

Participation in the following structures & large-scale projects:

checking engineer
chief engineer
concept designer
design engineer
erection engineer

Bibliography

  1. Goodyear, David / Salamie, Ralph (1994): The New Clark Bridge: Saddle-Draped Cables. In: Civil Engineering Magazine, v. 64, n. 8 (August 1994), pp. 46-49.
  2. Goodyear, David / Klamerus, Bonnie / Turton, Rob: The New Colorado River Arch Bridge at Hoover Dam. An Innovative Hybrid of Concrete and Steel. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 222-223.
  3. Goodyear, David / Sun, John (2003): New Developments in Cable-Stayed Bridge Design, San Francisco. In: Structural Engineering International, v. 13, n. 1 (February 2003), pp. 59-63.

    https://doi.org/10.2749/101686603777965035

  4. Goodyear, David / Smit, N. / Headcock, J. / Starkey, S. (2001): Respect for tradition - The new Crooked River Gorge Bridge. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 955-964.
  • About this
    data sheet
  • Person-ID
    1002926
  • Date created
    09/09/2003
  • Last Update
    22/07/2014