Taktschiebebrücken in Mischbauweise am Beispiel der Talbrücke Scherenbusch

Vergleich mit weiteren aktuellen Bauwerken im In- und Ausland

Author(s):


Medium: journal article
Language(s): de 
Issue: Beton- und Stahlbetonbau", , n. 4, v. 98
Page(s): 209-216
DOI: 10.1002/best.200301160
Abstract:

Incrementally launched Bridges with combined internal and external Post-Tensioning.
Incremental launching of prestressed concrete bridges is known to be a very cost effective construction method, even now after the general regulation to incorporate external tendons into box girders in Germany. This applies in particular in case of the superstructure being prestressed from both internal tendons during construc- tion and additional external tendons for the final state of the superstructure. By using the recently completed road bridge Scherenbusch as an example, the construction method is generally discussed and consequently compared with two other new viaducts of the same type. Finally, a brief comparison with international examples is being performed and the possible influence resulting from future changes in the codes is pointed out.

Structures and Projects

Structure Types

  • About this
    data sheet
  • Reference-ID
    10011990
  • Date created
    08/12/2003
  • Last Update
    14/08/2014