0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Studies on the impact of functional analysis concept design on reduction in change orders

Author(s):

Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 3, v. 17
Page(s): 251-267
DOI: 10.1080/014461999371475
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/014461999371475.
  • About this
    data sheet
  • Reference-ID
    10213330
  • Published on:
    04/12/2018
  • Last updated on:
    04/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine