El puente nº 3 sobre la carretera N-II del distribuidor regional del este, Alcalá de Henares, Madrid

Author(s):


Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 214, v. 50
Page(s): 59-67
Abstract:

Bridge No. 3 over 0-II, Alcalá de Henares (Madrid)

This paper describes a bridge with 10 + 26 + 26 + 26 + 10 span lenght. The bridge has composite deck section and was built with precast segments and external presstressing. Segment building process is described, although there are many common aspects with other precast segment bridges, the singularities comes throught the steel webs. Deck building process is done by hanging deck segments frorn a autolaunching girder using prestress bars. Bridge construction was done over 22 high-way nearby Alcala de Henares. With this construction procedure tragic is not affected. Poligonal prestress geometry is described as well as diaphragms and anchorage elements. Design methods are explained, such as torsional stiffness evaluation and other singularities.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Geographic Locations

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075906
  • Published on:
    01/11/2018
  • Last updated on:
    01/11/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine