0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

London Underground – successful outcome of bridge assessment programme

Author(s):
Medium: journal article
Language(s): English
Published in: Proceedings of the Institution of Civil Engineers - Bridge Engineering, , n. 2, v. 169
Page(s): 113-125
DOI: 10.1680/jbren.15.00013

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/jbren.15.00013.
  • About this
    data sheet
  • Reference-ID
    10086345
  • Published on:
    02/12/2018
  • Last updated on:
    02/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine