Advertisement

Share

Follow

The Inclined Towers of the Ebro and Lérez Bridges

Author(s):
Medium: journal article
Language(s): en 
Published in: Structural Engineering International, , n. 4, v. 8
Page(s): 258-260
DOI: 10.2749/101686698780488776
Abstract:

The Sancho el Mayor Bridge over the Ebro River, with a main span 147 m long, was designed in 1976 and built in 1978. More recently, a somewhat similar bridge with a 125-m-long single span has been built across the Lérez River, designed in 1992 and built in 1995. This second bridge may be considered an update of the main ideas that were first expressed in the Ebro bridge design.

Structures and Projects

Advertisement

  • About this
    data sheet
  • Reference-ID
    10003804
  • Date created
    20/09/2002
  • Last Update
    28/10/2016