Gibraltar Strait Crossing - An Alternative: a Submerged Bridge-Tunnel

Author(s):
Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 2, v. 2
Page(s): 140-142
DOI: 10.2749/101686692780615888
Abstract:

For the Gibraltar Strait Crossing, two classical solutions have been under close scrutiny: Excavated Tunnel (54 km long) and Suspension Bridge (30 km long, with many 2,000 m spans). Another, third solution - Suspension Bridge (14 km long with two main 5,000 m spans) - has been also examined. In this article, another solution is proposed - a Submerged Bridge-Tunnel (on the shortest route - 14 km). Its advantages - design and construction time, cost, etc. - are due mainly to 1) eliminating the gravity loads by the hydrostatic buoyancy forces, 2) absence of wind and temperature influences, and 3) absence, entirely or partially, of many preliminary, expensive, and time-consuming studies and investigations.

Structures and Projects

  • About this
    data sheet
  • Reference-ID
    10003422
  • Published on:
    18/09/2002
  • Last updated on:
    28/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine