0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ersatzneubau der Talbrücke Heidingsfeld

Author(s):
Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 10, v. 85
Page(s): 670-676
DOI: 10.1002/stab.201610419
Abstract:

Replacement of the viaduct Heidingsfeld.

50 years after its construction the 665 m long viaduct Heidingsfeld will be totally replaced. Hereby the steel composite superstructure from 1964 is constructed again as a steel composite section, which is formed in every roadway by a modern unicellular steel box with external cantilevers and concreted slab. Due to the topographical conditions and the conditions for maintaining a 4+0 traffic the steel construction will be installed by longitudinal launching with spans up to 120 m.

Keywords:
steel construction Heidingsfeld Donges
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stab.201610419.
  • About this
    data sheet
  • Reference-ID
    10074833
  • Published on:
    10/11/2016
  • Last updated on:
    21/01/2017
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine