0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Enlace de Cadagua. Lanzamientos, ripados, izados y montajes con grúa de cinco puentes mixtos

Author(s):




Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 267, v. 64
Page(s): 61-80
Abstract:

Cadagua Junction. Launching, skidding, lowering and crane-aided positioning of five composite bridges

The link, being part of the southern peripheral highway of Bilbao (Spain), is situated in the narrow valley of the Cadagua River. Due to the complex topographic situation of the link (beginning and ending at tunnels; situated above the river, two railways, two roads and one highway), there was little space available for constructing the five composite bridges (viaducts V1, V2, VR2, V3 y V4). Hence the steel girder boxes of two main viaducts were launched completely (V1 and V2), part of steel girder boxes of the lateral bridges were put in place before launching on them (V4 on V1 and VR2 on V2) and were launched together. Having finished the process of launching, the steel girder boxes of the lateral bridges were skidded and lowered to their final positions. Further positioning of steel girder boxes was carried out by crane and other auxiliary media (positioning of remaining parts of V4 and VR2, complete positioning of V3).

Keywords:
composite bridges launching lifting skidding lowering positioning by crane

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075521
  • Published on:
    01/10/2018
  • Last updated on:
    01/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine