0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Study on the Continuous Prestressed Concrete Beam Bridge Risk Assessment in Construction Phase

 Study on the Continuous Prestressed Concrete Beam Bridge Risk Assessment in Construction Phase
Author(s): , ,
Presented at IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, published in , pp. 2138-2146
DOI: 10.2749/stockholm.2016.2146
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.19 MB

The risk assessment has been studied for bridge Construction, in order to reduce the occurrence probability of the accident and ensure the personnel and structural safety. The hierarchical decompos...
Read more

Bibliographic Details

Author(s): (School of Civil Engineering, Beijing Jiao tong University, Beijing 100044,China)
(China Academy of Transportation Sciences, Beijing 100029, China)
(School of Civil Engineering, Beijing Jiao tong University, Beijing 100044, China)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Published in:
Page(s): 2138-2146 Total no. of pages: 9
Page(s): 2138-2146
Total no. of pages: 9
Year: 2016
DOI: 10.2749/stockholm.2016.2146
Abstract:

The risk assessment has been studied for bridge Construction, in order to reduce the occurrence probability of the accident and ensure the personnel and structural safety. The hierarchical decomposes method has been used in the project to decompose the construction phase of each part and to identify the basic risk sources; by the way of letter inquiry to consult experts for analysing and estimating the risk; according to risk probability and risk level assignment to determine risk value; the risk list has been ultimately formed. We must consider the acceptable level of risk; the decision-makers can make optimal decisions using the theoretical achievement. The risk assessment used in the continuous prestressed concrete beam bridge construction phase has given good results and gained high appraisal.

Keywords:
risk assessment construction phase prestressed concrete continuous beam risk source recognition Sustainable Built Environment