Severn Bridge – Recent Assessment of Main Suspension Cables

Author(s):

Medium: conference paper
Language(s): English
Conference: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Published in:
Year: 2011
Abstract:

The Severn Bridge was built in 1966 and was a pioneer of streamlined box girder deck construction. An investigation of the capacity of the suspension cables was commissioned in response to corrosion concerns brought about by inspections of similar suspension bridges. The first intrusive inspection found corrosion of cables resulting in reduced strength. In response, acoustic monitoring and an enhanced dry air injection system were installed. A corrosion-based deterioration model was also developed. An initial assessment of the cable based was then carried out. A second intrusive inspection was then carried out to allow a more realistic assessment of the conditions of the cables to be made and has also been used to calibrate and update the deterioration model. This has shown that the loss of strength of the cables is no worse that the calculated capacity undertaken following the initial examination and the current system of protection has stabilised the condition of the cable.

Keywords:
assessment suspension cables Severn Bridge corrosion modelling

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10065655
  • Published on:
    03/10/2011
  • Last updated on:
    05/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine