0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An innovative technique for fitting trackwork alignments through the railway envelope of a cable-stayed bridge

Author(s):
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Cable-Stayed Bridges - Past, Present and Future, Malmö, Sweden, 2-4 June 1999
Published in:
Page(s): 501-510
Year: 1999
DOI: 10.5169/seals-62150

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5169/seals-62150.
  • About this
    data sheet
  • Reference-ID
    10010769
  • Published on:
    20/11/2003
  • Last updated on:
    20/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine