0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Experiences in infrastructure and bridge risk management

 Experiences in infrastructure and bridge risk management
Author(s): ,
Presented at IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, published in , pp. 124-131
DOI: 10.2749/stockholm.2016.0124
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.2 MB

The paper presents the results of some experiences acquired in the past years in the field of Infrastructure and in particular bridge risk management. The assessment of the health conditions of exi...
Read more

Bibliographic Details

Author(s): (Studio Franchetti, Arzignano, VI, ITALY)
(Studio Franchetti, Arzignano, VI, ITALY)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Published in:
Page(s): 124-131 Total no. of pages: 8
Page(s): 124-131
Total no. of pages: 8
Year: 2016
DOI: 10.2749/stockholm.2016.0124
Abstract:

The paper presents the results of some experiences acquired in the past years in the field of Infrastructure and in particular bridge risk management. The assessment of the health conditions of existing infrastructures, on the basis of different levels of evaluation and different steps of analysis is presented. For some structures (i.e. Rio-NiterĂ³i Bridge, length 13,29 km) the work involved the definition and implementation of a Monitoring Plan for all the structural elements. Moreover, an activity of technical inspection was carried out in order to assess the health conditions of the structure. Many experiences were made on the analysis of complex road networks, in California, Italy and Brazil. The studies had the main purpose of assessing the vulnerability of the bridges of the whole road network and perform an optimization of the budget allocation and prioritization for annual programs of maintenance. The reported experiences were eventually analysed in term of cost-effectiveness and impact, in order to assess their effectiveness and the presence of potential alternatives, and to outline an optimal procedure of risk management.

Keywords:
steel concrete bridges risk management inspection and maintenance