Study on the Continuous Prestressed Concrete Beam Bridge Risk Assessment in Construction Phase

 Study on the Continuous Prestressed Concrete Beam Bridge Risk Assessment in Construction Phase
Auteur(s): , ,
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 2138-2146
DOI: 10.2749/stockholm.2016.2146
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

The risk assessment has been studied for bridge Construction, in order to reduce the occurrence probability of the accident and ensure the personnel and structural safety. The hierarchical decompos...
Lire plus

Détails bibliographiques

Auteur(s): (School of Civil Engineering, Beijing Jiao tong University, Beijing 100044,China)
(China Academy of Transportation Sciences, Beijing 100029, China)
(School of Civil Engineering, Beijing Jiao tong University, Beijing 100044, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 2138-2146 Nombre total de pages (du PDF): 9
Page(s): 2138-2146
Nombre total de pages (du PDF): 9
Année: 2016
DOI: 10.2749/stockholm.2016.2146
Abstrait:

The risk assessment has been studied for bridge Construction, in order to reduce the occurrence probability of the accident and ensure the personnel and structural safety. The hierarchical decomposes method has been used in the project to decompose the construction phase of each part and to identify the basic risk sources; by the way of letter inquiry to consult experts for analysing and estimating the risk; according to risk probability and risk level assignment to determine risk value; the risk list has been ultimately formed. We must consider the acceptable level of risk; the decision-makers can make optimal decisions using the theoretical achievement. The risk assessment used in the continuous prestressed concrete beam bridge construction phase has given good results and gained high appraisal.