0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Curzon Street Station Approach. Composite Viaducts: Lawley Middleway and Duddeston Junction Viaducts. Design for launching construction methodology

 Curzon Street Station Approach. Composite Viaducts: Lawley Middleway and Duddeston Junction Viaducts. Design for launching construction methodology
Auteur(s): , , , ,
Présenté pendant IABSE Congress: The Essence of Structural Engineering for Society, Ghent, Belgium, 27-29 August 2025, publié dans , pp. 2739-2747
DOI: 10.2749/ghent.2025.2739
Cette publication n'est pas disponible en texte intégral pour l'instant.
Télécharger l'aperçu (fichier PDF) 0.36 MB

Lawley Middleway and Duddeston Junction are two steel–concrete composite viaducts passing through urban areas and crossing over existing railway lines, roads, and a river to bring the new HS2 High ...
Lire plus

Détails bibliographiques

Auteur(s): (Mott MacDonald Spain, Madrid, Spain)
(Mott MacDonald Spain, Madrid, Spain)
(Mott MacDonald Spain, Madrid, Spain)
(Mott MacDonald Czech, Brno, Czech)
(Balfour Beatty VINCI JV, Birmingham, UK)
(Balfour Beatty VINCI JV, Birmingham, UK)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Essence of Structural Engineering for Society, Ghent, Belgium, 27-29 August 2025
Publié dans:
Page(s): 2739-2747 Nombre total de pages (du PDF): 9
Page(s): 2739-2747
Nombre total de pages (du PDF): 9
DOI: 10.2749/ghent.2025.2739
Abstrait:

Lawley Middleway and Duddeston Junction are two steel–concrete composite viaducts passing through urban areas and crossing over existing railway lines, roads, and a river to bring the new HS2 High Speed Rail line to the future Curzon Street Station in central Birmingham. These viaducts will be part of the new Birmingham City landscape have been designed considering the most advanced “state of the art” codes, material performance and construction methods. Special consideration is given to the innovative launching sequence required for the installation of the viaducts: a combination of self-propelled modular transporters (SPMTs), skid-shoes and jacking towers for Lawley Middleway and an incremental launching of a steel deck curved in plan with a non-uniform radius for Duddeston Junction. The collaborative environment developed between the designer and the Contractor and HS2 has been key for project success.

Mots-clé:
viaduc