General Information
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Frankfurt, Hesse, Germany |
---|---|
Crossed: |
|
Replaced by: |
Schwanheim Bridge (1963)
|
Technical Information
Dimensions
deck | deck width | 3 m |
Cost
cost of construction | Reichsmark 368 000 |
Materials
truss |
steel
|
---|
Chronology
25 March 1945, 05:00 | Dynamited by retreating German troops. |
---|---|
1946 — 1947 | A temporary bailey bridge is installed as replacement. |
1954 | Last strengthening of the bailey bridge. |
1960 — 1963 | Construction of a permanent replacement bridge. |
Participants
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Frankfurter Brücken. Schleusen, Fähren, Tunnels und Brücken des Mains. Societäts-Verlag, Frankfurt (Germany), pp. 201-204. (1982):
- About this
data sheet - Structure-ID
20005258 - Published on:
21/09/2002 - Last updated on:
25/10/2017