0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1905
Completion: 1907
Status: destroyed (25 March 1945)

Project Type

Structure: Through truss bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , ,
Crossed:
  • Main River
Replaced by: Schwanheim Bridge (1963)

Technical Information

Dimensions

deck deck width 3 m

Cost

cost of construction Reichsmark 368 000

Materials

truss steel

Chronology

25 March 1945, 05:00

Dynamited by retreating German troops.

1946 — 1947

A temporary bailey bridge is installed as replacement.

1954

Last strengthening of the bailey bridge.

1960 — 1963

Construction of a permanent replacement bridge.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005258
  • Published on:
    21/09/2002
  • Last updated on:
    25/10/2017