0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Мост краљевићу Томиславу (Most kraljeviću Tomislavu)
Beginning of works: 1921
Completion: 20 May 1928
Status: destroyed (11 April 1941)

Project Type

Location

Location: , ,
Crossed:
  • Danube
Replaced by: Varadin Bridge (1946)
Coordinates: 45° 15' 16.72" N    19° 51' 26.66" E
Show coordinates on a map

Technical Information

Dimensions

width 9.6 m
total length 341 m
number of lanes 2

Materials

piers reinforced concrete
truss steel

Participants

Design
Steel construction

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20090541
  • Published on:
    26/02/2025
  • Last updated on:
    27/02/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine